Hi there I’m doing a rendering job rough cast been removed bricks are shot had damp problems inside the house, I’ve sbr slurried the front and back and scratched most of it 4:1 with water proofer and half bucket of lime I’ve left a few bits unscratched as it went dark, Will it be ok to go onto the sbr slurry in a few days as I know your mento go on to it whilst tacky? Don’t ask why I’m rendering in December the money was right lol
↧