How feasible is it to render a house in a couple of sections with weeks in between? I ask because it will be very difficult (impossible) to do my place in one go.
The scaffolding's going up on Monday, and that will allow the side and back of the extension to be done. However, I won't be able to get the bay sides built with the scaffolding up as the ground floor front needs to be left open for a while.
So I was thinking that if it's feasible, the side can be done to the front corner and...
Rendering in sections?
The scaffolding's going up on Monday, and that will allow the side and back of the extension to be done. However, I won't be able to get the bay sides built with the scaffolding up as the ground floor front needs to be left open for a while.
So I was thinking that if it's feasible, the side can be done to the front corner and...
Rendering in sections?